View Single Post
Old 02-17-2004, 10:18 PM   #10 (permalink)
Rodney
Observant Ruminant
 
Location: Rich Wannabe Hippie Town
Quote:
Originally posted by thebigk
I've seen a handful of episodes, and I'm wondering how real their time limit is. They've been working down to the "last second" a couple of times, but I've never seen them fail. Has it ever happened that they didn't finish?
As diergray said, there was one failure. But most of the time, these guys don't really complete everything they've set out to do; they just reach a point that the producers accept as complete on the major projects; sometimes that means that a device that they put in the wall (the swing-out disco ball comes to mind) is installed and working, but they overlook the little detail that that the hole they tore in the wall still needs to be sheetrocked and plastered.


I 'm pretty sure that the production company has a clean-up crew of construction workers standing by who come in and finish the details (and also to finish the job if the team of the week screws up). Then the decorators move in.
Rodney is offline  
 