I am really curious.....
How were you planning to pull wires with the finished ceiling still in place?
I can understand how you can run wires in the space between the joists, but how exactly were you planning to run them transverse to the joists?
Unless you want to cut drywall out.
Also, I have never seen insulation between the first and second floor unless there is underfloor hydronic heating in place. Sound usually isn't too much of an issue.
But if there is insulation, then you need to keep the insulation off of the fixtures.
I would suggest the mini-floods (in either incandescent or halogen) as opposed to the big honking 4" 150 watt floods from 1982
|