Quote:
Originally Posted by willravel
. Remember the "official" position? Remember those "heated and deformed bolts," which we're to believe gave way, almost simultaneously? In chapter two of the FEMA report, it is revealed that the bolts of the "weakened" floor beams were lateral (sideways) supports; not vertical. The vertical support plates (L-shamed "hanger brackets") for the floor joists were welded!
|
There was a show on the Discovery {I think} channel about when the WTC was built there was some sort of problem with the bolts or ?? {can't remember really
} that was discovered several years later by a graduate student I believe. Anyway, rather than ramble, to fix the problem they went in at night and welded all the outer joints to prevent a failure during hurricane force winds.
Not to hijack such an interesting thread but does anyone else remember seeing this ?