What you will need to do is remove earth on the high side of the elevation until the pier blocks sit level in both planes. Do not remove too much at a time, as disturbed soil will settle, changing the elevation. When in doubt, use a tool called a digging bar-one end is spade shaped, and the other circular to tamp the soil and ensure compaction and future stability.
__________________
There ain't nothin' more powerful than the odor of mendacity -Big Daddy
|