well, first they will clear the area and put up silt fences. The silt fences should be maintained through-out the construction.
Scrappers are pushed by dozers to collect a lot of soil, the soil is placed at the fill, another dozer spreads the soil out, when 6-12 inches are placed the compactors (roller, sheep-foot, etc) compact the soil.
The soil can also be moved with dump trucks.
The earthwork team is probably different than the building construction team. When the house construction crews come in they will work their own sites.
|